Solar field installation

Project:
Solar field design and installation
Client:
Dairy farm
Location:
Lanarkshire
Value:
£1million
Timescale:
Three months

This project involved the design and installation of a 1MWh solar field, with works being conducted in two phases.

Pre-construction: geotechnical and ecological surveys, liaison with distribution network operator, planning permission application, sustainable drainage system design, PV array layout, frame mount design, low-voltage system, high-voltage system, civil works.

Construction: co-ordination and installation of mounting structures, PV modules, inverters, switchgear and sub-station; installation of AC and DC cabling, installation of DC combiner boxes including connections, co-ordination and installation of HV and medium-voltage cabling; all testing and commissioning, construction of access roads, trenching, ducting, fencing and plinths; installation of security cameras.